Gais Construction completed this ground-up restaurant construction project in Denver NC in the fall of 2019. This restaurant construction project consisted of 3,397 square feet.
Project Location: 270 Hawthorne Dr., Denver, NC 28037
-
Test
Gais Construction worked with owners Ketan and Kathy Patel in collaboration with Peadon Finein Architecture to build the 1250 square foot Bottle Shop in the Camden Building. The project was finished in 2016 and took 3 months to complete.
Project Location: 1750 Camden Rd., Unit A, Charlotte, NC 28203
-
Test
Gais Construction worked with owners to up fit Spandex City in 2014. The project was 2020 square feet and was completed in 35 days.
-
Test
Gais Construction has completed over 12 Save a Lot Food Stores over the past 8 years. The projects are very intensive and time sensitive.
-
Test
Gais Construction completed the renovation of Rock Springs Elementary School into what is now Holy Spirit Catholic Church. The school had been a major landmark in Denver, NC for over 60 years. The building was old and required extensive renovation and remodeling to create this beautiful Sanctuary.
-
Test
-
Test
Gais Construction worked with the owner Justin Karas to up fit the uptown Charlotte location of Newk's Eatery in 2010. The location is 4200 square feet and was a challenge as it was located at the street level of the Trade and Tryon tower, yet was completed in 88 days.
Retail projects have some specific variables that are not typical to other construction projects. Gais Construction has Retail construction experience especially in grocery. We will guide owners and their projects through the standard construction steps, along with these Retail specific items:
Exterior Doors: automatic entry doors and overhead loading dock doors (ASSA Abloy)
Refrigeration: cases, walk-in coolers, meat coolers
Shelving: merchandising shelving
Coordination: Corporate Construction Manager, Corporate Operations Manager, POS, AV/camera/security, and EMS (Energy Management System)
Ground Up projects also have some specific variables that are not typical to other construction projects. Gais Construction has Ground Up construction experience in restaurants, retail plazas, and office plazas. We will guide owners and their projects through the standard construction steps, along with these Ground Up specific items:
Sitework: grading, storm drains, piping, asphalt, concrete, curb, parking lot striping, sidewalks, and landscaping
Utilities: sewer, water, electric and cable/phone